Triple
T34806117
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Harh |
E1003360
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Nanakshahi calendar month |
C31868
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Nanakshahi calendar month Context triple: [Harh, instanceOf, Nanakshahi calendar month]
-
A.
Sikh calendar
chosen
The Sikh calendar is a lunisolar timekeeping system, primarily the Nanakshahi calendar, used to determine Sikh religious festivals, historical commemorations, and the observance of important dates in Sikhism.
-
B.
Badí‘ calendar month
A Badí‘ calendar month is one of the nineteen equal periods of nineteen days each that structure the Bahá’í year, each bearing a distinct spiritual name and significance.
-
C.
Tithi
Tithi is a conceptual class representing a lunar day in the traditional Indian calendar, defined by the angular distance between the Sun and Moon and used to determine auspicious timings and ritual observances.
-
D.
Hindu lunar fortnight
A Hindu lunar fortnight is a half-month period in the Hindu calendar, consisting of approximately 15 lunar days (tithis) between either a new moon and full moon (shukla paksha) or a full moon and new moon (krishna paksha).
-
E.
period in the Hindu calendar
A period in the Hindu calendar is a defined span of time, such as a tithi, paksha, month, or season, used to organize religious observances, festivals, and astrological calculations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76db600b88190989abdf08fce3b27 |
completed | May 3, 2026, 3:45 p.m. |
Created at: May 3, 2026, 3:59 p.m.