Triple

T34805364
Position Surface form Disambiguated ID Type / Status
Subject Turkish Army’s entry into İzmir E1003337 entity
Predicate militaryPhase P72305 FINISHED
Object final phase of the Turkish War of Independence LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: final phase of the Turkish War of Independence | Statement: [Turkish Army’s entry into İzmir, militaryPhase, final phase of the Turkish War of Independence]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: militaryPhase
Context triple: [Turkish Army’s entry into İzmir, militaryPhase, final phase of the Turkish War of Independence]
  • A. warPhase chosen
    Indicates the specific stage or period within a war or armed conflict during which an event, action, or condition occurs.
  • B. missionProfilePhase
    Indicates the specific phase or stage within a mission profile during which an action, condition, or relationship is applicable.
  • C. missionPhaseTested
    Indicates that a specific mission phase has been evaluated or validated through testing.
  • D. militaryActivity
    Indicates that an entity is engaged in, associated with, or affected by actions, operations, or preparations conducted by armed forces.
  • E. missionPhaseAfter
    Indicates that one mission phase occurs later in sequence or time than another mission phase.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76db600b88190989abdf08fce3b27 completed May 3, 2026, 3:45 p.m.
NER Named-entity recognition batch_69fcef654d588190b29ecc76678d1aa0 completed May 7, 2026, 8 p.m.
PD Predicate disambiguation batch_69fcecdb97f48190b382b7d13be92dc0 completed May 7, 2026, 7:49 p.m.
Created at: May 3, 2026, 3:59 p.m.