Triple

T34796861
Position Surface form Disambiguated ID Type / Status
Subject Leicester and Swannington Railway E1003113 entity
Predicate instanceOf P0 FINISHED
Object coal railway C13460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coal railway
Context triple: [Leicester and Swannington Railway, instanceOf, coal railway]
  • A. industrial railway chosen
    An industrial railway is a specialized rail system used within or between industrial facilities to transport raw materials, goods, and equipment efficiently as part of production and logistics operations.
  • B. rail
    A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
  • C. rail
    A rail is a long, continuous bar or track that provides guidance, support, or a running surface for vehicles, objects, or people in transportation or structural systems.
  • D. steam-powered railway
    A steam-powered railway is a transportation system in which trains are propelled along tracks by locomotives that generate mechanical power from steam produced by boiling water, typically using coal or other fuels.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76db543808190b188c6c86a91491b completed May 3, 2026, 3:45 p.m.
Created at: May 3, 2026, 3:59 p.m.