Triple

T34771642
Position Surface form Disambiguated ID Type / Status
Subject Supreme E1002377 entity
Predicate instanceOf P0 FINISHED
Object high-speed train series C31908 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-speed train series
Context triple: [Supreme, instanceOf, high-speed train series]
  • A. high-speed electric multiple unit train
    A high-speed electric multiple unit train is a self-propelled, electrically powered passenger trainset composed of multiple interconnected cars, designed to operate at very high speeds with rapid acceleration, efficient braking, and streamlined aerodynamics for intercity or regional service.
  • B. high-speed test train
    A high-speed test train is a specialized railway vehicle designed to operate at very high velocities to evaluate, validate, and optimize track infrastructure, signaling systems, and rolling stock performance under extreme operating conditions.
  • C. Japanese Shinkansen train series chosen
    A Japanese Shinkansen train series is a family of high-speed electric multiple unit trains designed and operated for rapid, reliable, and comfortable intercity passenger service on Japan’s dedicated bullet train network.
  • D. high-speed railway
    A high-speed railway is a rail transport system designed for trains that operate at significantly higher speeds than traditional rail services, typically on specially built or upgraded tracks, to provide fast, efficient, and reliable long-distance passenger travel.
  • E. InterCityExpress variant
    An InterCityExpress variant is a specific model or configuration of high-speed ICE train designed for particular routes, capacities, or service requirements within an intercity rail network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76db20dac8190b1e8d0ca4dc1d59f completed May 3, 2026, 3:45 p.m.
Created at: May 3, 2026, 3:59 p.m.