Triple
T34747364
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Northern line extension to Battersea |
E1001673
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | London Underground line extension project |
C24427
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: London Underground line extension project Context triple: [Northern line extension to Battersea, instanceOf, London Underground line extension project]
-
A.
cross-London rail system
A cross-London rail system is an integrated network of rail lines and tunnels that traverse the city from one side to the other, providing high-capacity, rapid transit across central London and connecting outer suburbs.
-
B.
London Underground line segment
A London Underground line segment is a continuous stretch of track connecting two adjacent stations on a specific Tube line, along which trains travel directly without intermediate stops.
-
C.
London Underground precursor
A London Underground precursor is any early urban rail or transport system, proposal, or technological development that directly influenced or led to the creation of the London Underground.
-
D.
subway line extension
chosen
A subway line extension is an added segment of track and stations that lengthens an existing subway route to serve new areas and increase transit capacity.
-
E.
London Underground service pattern
A London Underground service pattern is the structured arrangement of train routes, frequencies, stopping points, and operating times across the network that determines how services run on each line and branch.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76db0367081909b57c50a7fb03025 |
completed | May 3, 2026, 3:45 p.m. |
Created at: May 3, 2026, 3:59 p.m.