Triple

T34727516
Position Surface form Disambiguated ID Type / Status
Subject Christmas on Earth Continued (related projects and screenings) E1001110 entity
Predicate instanceOf P0 FINISHED
Object expanded cinema project series C33553 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: expanded cinema project series
Context triple: [Christmas on Earth Continued (related projects and screenings), instanceOf, expanded cinema project series]
  • A. architecture film series
    A curated sequence of films that explore, depict, or critically engage with architecture, the built environment, and spatial design.
  • B. film exhibition infrastructure project
    A film exhibition infrastructure project is a coordinated initiative to design, build, upgrade, or network physical and digital venues, technologies, and support systems that enable the public screening and distribution of films.
  • C. curated film series chosen
    A curated film series is a thoughtfully selected and thematically organized collection of movies presented together to highlight specific ideas, styles, creators, or cultural perspectives.
  • D. concert film series
    A concert film series is a collection of films that document live musical performances, often by the same artist or within a shared theme, presented across multiple installments.
  • E. film exhibition format
    A film exhibition format is a standardized method or medium (such as 35mm, IMAX, or digital projection) used to present motion pictures to an audience in theaters or other viewing environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76daeb6e48190a4c9a6b0edc80f72 completed May 3, 2026, 3:45 p.m.
Created at: May 3, 2026, 3:59 p.m.