Triple
T34727006
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bristol Wharf |
E1001098
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | riverfront public space |
C26361
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: riverfront public space Context triple: [Bristol Wharf, instanceOf, riverfront public space]
-
A.
waterfront public space
chosen
A waterfront public space is a shared, accessible area along a body of water designed for recreation, social interaction, and enjoyment of the natural and urban waterfront environment.
-
B.
urban public space
An urban public space is a publicly accessible area within a city—such as streets, parks, plazas, and squares—designed or used for social interaction, movement, recreation, and civic life.
-
C.
waterfront square
A waterfront square is a public open space located along a body of water, designed for social gathering, recreation, and visual enjoyment of the waterfront.
-
D.
waterfront district
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
E.
waterfront street
A waterfront street is a public roadway or pedestrian thoroughfare that runs directly alongside a body of water, often featuring views, access points, and amenities oriented toward the shoreline.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76daeb6e48190a4c9a6b0edc80f72 |
completed | May 3, 2026, 3:45 p.m. |
Created at: May 3, 2026, 3:59 p.m.