Triple

T34714017
Position Surface form Disambiguated ID Type / Status
Subject Orion ground test campaign E1000724 entity
Predicate instanceOf P0 FINISHED
Object spacecraft ground test campaign C27168 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spacecraft ground test campaign
Context triple: [Orion ground test campaign, instanceOf, spacecraft ground test campaign]
  • A. aerospace testing activity chosen
    An aerospace testing activity is a structured process of evaluating aerospace systems, components, or operations under controlled conditions to verify performance, safety, reliability, and compliance with specified requirements.
  • B. space systems test and evaluation course
    A space systems test and evaluation course teaches the principles, methods, and tools used to plan, conduct, analyze, and report tests that verify and validate the performance, reliability, and mission readiness of space systems and their subsystems.
  • C. Mars mission engineering activity
    Mars mission engineering activity encompasses the planning, design, testing, and integration of systems and technologies required to safely transport, land, and support missions on the Martian surface and in its orbit.
  • D. spacecraft
    A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
  • E. spacecraft program
    A spacecraft program is an organized, long-term initiative that plans, develops, launches, and operates one or more spacecraft to achieve specific scientific, commercial, or exploratory objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dad3f108190a280fd0a2f4ee89a completed May 3, 2026, 3:45 p.m.
Created at: May 3, 2026, 3:59 p.m.