Triple
T34711669
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Doroteo Jose station |
E1000663
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Manila LRT Line 1 station |
C61947
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Manila LRT Line 1 station Context triple: [Doroteo Jose station, instanceOf, Manila LRT Line 1 station]
-
A.
Manila LRT Line 2 station
A Manila LRT Line 2 station is a designated passenger facility along Line 2 of the Manila Light Rail Transit system that provides platforms, ticketing, and access points for boarding and alighting trains.
-
B.
Manila MRT Line 3 station
A Manila MRT Line 3 station is a designated stop along Metro Manila’s elevated rapid transit Line 3, providing passenger access, boarding, and alighting services within the rail network.
-
C.
Philippine National Railways station
A Philippine National Railways station is a designated facility along the PNR rail network where trains stop to allow passengers and, in some cases, freight to board, alight, or be transferred.
-
D.
Pink Line station
A Pink Line station is a designated stop or terminal along a transit system’s Pink Line where passengers can board, alight, and transfer between services.
-
E.
BTS Skytrain station
A BTS Skytrain station is an elevated or at-grade rail stop on Bangkok’s rapid transit system where passengers board, alight, and transfer between Skytrain lines and other transport modes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dad3f108190a280fd0a2f4ee89a |
completed | May 3, 2026, 3:45 p.m. |
Created at: May 3, 2026, 3:59 p.m.