Triple
T34696882
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sabbatical Officer |
E891055
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | full-time role |
C58797
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: full-time role Context triple: [Sabbatical Officer, instanceOf, full-time role]
-
A.
principal role
A principal role is a primary, high-responsibility position within an organization or system that holds decision-making authority and significant influence over outcomes.
-
B.
public official role
A public official role is a position of authority or responsibility within government or public institutions, empowered to make or influence decisions that affect the public interest.
-
C.
dual role
A dual role is a situation in which one person simultaneously holds two distinct, often conflicting, positions or responsibilities within the same relationship or context.
-
D.
senior clerical role
A senior clerical role is a higher-level administrative position responsible for overseeing complex office tasks, ensuring accurate records and documentation, and often supervising junior clerical staff.
-
E.
full-time military force
A full-time military force is a permanently organized, professional body of armed personnel maintained by a state or authority, whose primary occupation is to train for, deter, and conduct military operations.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349db7ab8819086808e833f472871 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:05 a.m.