Triple

T34685782
Position Surface form Disambiguated ID Type / Status
Subject Cathal O’Rourke E890742 entity
Predicate instanceOf P0 FINISHED
Object construction industry executive C65884 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction industry executive
Context triple: [Cathal O’Rourke, instanceOf, construction industry executive]
  • A. construction pioneer
    A construction pioneer is an innovative leader who introduces groundbreaking methods, materials, or technologies that significantly advance how the built environment is designed and constructed.
  • B. construction firm
    A construction firm is a business organization that plans, manages, and executes building and infrastructure projects, coordinating labor, materials, equipment, and subcontractors to deliver completed structures for clients.
  • C. construction worker
    A construction worker is a skilled laborer who builds, repairs, and maintains structures and infrastructure using tools, machinery, and physical effort while following safety and building regulations.
  • D. construction conglomerate
    A construction conglomerate is a large, diversified corporate group that owns and manages multiple construction-related companies across sectors such as infrastructure, real estate, engineering, and industrial projects.
  • E. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349dabc008190a18999c26682ed47 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:05 a.m.