Triple

T34683246
Position Surface form Disambiguated ID Type / Status
Subject Militärstrukturen des Warschauer Paktes E890673 entity
Predicate Planungsinstrument P66258 FINISHED
Object gemeinsame Operationspläne für einen Krieg in Europa LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: gemeinsame Operationspläne für einen Krieg in Europa | Statement: [Militärstrukturen des Warschauer Paktes, Planungsinstrument, gemeinsame Operationspläne für einen Krieg in Europa]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: Planungsinstrument
Context triple: [Militärstrukturen des Warschauer Paktes, Planungsinstrument, gemeinsame Operationspläne für einen Krieg in Europa]
  • A. hasPlanningInstrument
    Indicates that an entity is associated with, or governed by, a specific planning instrument (such as a plan, policy, or regulatory document) that guides its development or management.
  • B. managementPlanningTool
    Indicates that an entity is a tool or system used to support, organize, or execute management planning activities for another entity or process.
  • C. regionalPlanningInstrument
    Indicates that an entity is a formal tool, policy, or framework used to guide and regulate planning and development within a specific geographic region.
  • D. planningDiscipline
    Indicates that an entity applies structured planning methods, rules, or practices to organize and manage activities or processes.
  • E. planning chosen
    Indicates that an entity is engaged in organizing or devising a future action, event, or course of behavior involving another entity or entities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349dabc008190a18999c26682ed47 completed April 30, 2026, 12:23 p.m.
NER Named-entity recognition batch_69f7232a16a081909b775efc60b45244 completed May 3, 2026, 10:27 a.m.
PD Predicate disambiguation batch_69f72157af108190880317a62e634bb0 completed May 3, 2026, 10:20 a.m.
Created at: May 1, 2026, 2:05 a.m.