Triple

T34681202
Position Surface form Disambiguated ID Type / Status
Subject Chinese nuclear industry E890627 entity
Predicate instanceOf P0 FINISHED
Object national nuclear industry C17328 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: national nuclear industry
Context triple: [Chinese nuclear industry, instanceOf, national nuclear industry]
  • A. national nuclear energy program chosen
    A national nuclear energy program is a coordinated governmental initiative that plans, develops, regulates, and operates nuclear technologies to generate electricity and support related industrial, scientific, and security objectives.
  • B. nuclear industry company
    A nuclear industry company is an organization that designs, builds, operates, or services nuclear facilities and technologies for energy production, research, medicine, or defense while managing strict safety, regulatory, and environmental requirements.
  • C. nuclear technology organization
    A nuclear technology organization is an entity that researches, develops, regulates, or applies nuclear science and engineering for energy production, medical, industrial, or defense-related purposes.
  • D. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • E. nuclear power generation fleet
    A nuclear power generation fleet is a coordinated group of nuclear power plants and reactors managed collectively to produce electricity reliably, efficiently, and safely across a power system or region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349dabc008190a18999c26682ed47 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:05 a.m.