Triple

T34679138
Position Surface form Disambiguated ID Type / Status
Subject IERS Combination Centres E890574 entity
Predicate instanceOf P0 FINISHED
Object geodetic analysis centre C27847 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geodetic analysis centre
Context triple: [IERS Combination Centres, instanceOf, geodetic analysis centre]
  • A. geodetic organization
    A geodetic organization is an entity responsible for measuring, monitoring, and managing the Earth's geometric shape, gravity field, and spatial reference systems to support mapping, navigation, and geospatial analysis.
  • B. geodetic service organization chosen
    A geodetic service organization is an entity that plans, conducts, and manages geodetic measurements and analyses to provide accurate reference frames, positioning data, and related geospatial services.
  • C. geodetic observing system
    A geodetic observing system is an integrated network of instruments, platforms, and data-processing facilities designed to measure and monitor the Earth's shape, gravity field, rotation, and surface deformation with high precision.
  • D. geodetic reference point
    A geodetic reference point is a precisely surveyed physical location on the Earth's surface used as a fixed coordinate reference for mapping, surveying, and geospatial measurements.
  • E. geodetic datum
    A geodetic datum is a reference framework consisting of a defined origin, orientation, and scale used to precisely locate points on the Earth’s surface in terms of latitude, longitude, and elevation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349dabc008190a18999c26682ed47 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:05 a.m.