Triple
T34643831
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LPSC |
E889640
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rocket propulsion research and development centre |
C10695
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rocket propulsion research and development centre Context triple: [LPSC, instanceOf, rocket propulsion research and development centre]
-
A.
rocket research institute
chosen
A rocket research institute is an organization dedicated to the scientific study, design, testing, and advancement of rocket technologies and related space propulsion systems.
-
B.
space research centre
A space research centre is an institution dedicated to the scientific study, exploration, and technological development related to outer space and celestial phenomena.
-
C.
rocket design bureau
A rocket design bureau is an organization that specializes in the research, engineering, and development of rocket systems and related aerospace technologies.
-
D.
NASA rocket engine test facility
A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
-
E.
rocket engine manufacturer
A rocket engine manufacturer is a company that designs, produces, tests, and supplies propulsion systems and related components for launch vehicles and spacecraft.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349d825c88190bfc6170ac9281260 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:04 a.m.