Triple
T34616140
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Glitre Energi Produksjon |
E888868
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydroelectric power producer |
C58090
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydroelectric power producer Context triple: [Glitre Energi Produksjon, instanceOf, hydroelectric power producer]
-
A.
hydropower authority
A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
-
B.
waterpower company
chosen
A waterpower company is an organization that develops, operates, and manages facilities that convert the energy of moving or falling water into usable electrical power.
-
C.
run-of-the-river hydroelectric power plant
A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
-
D.
hydroelectric power complex
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
-
E.
planned hydroelectric power station
A planned hydroelectric power station is a proposed facility designed to generate electricity by harnessing the potential and kinetic energy of water, currently in the stages of planning, approval, or early development rather than operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349d584e08190b40b9f6281ad50c4 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:03 a.m.