Triple

T3461416
Position Surface form Disambiguated ID Type / Status
Subject Badaling E73033 entity
Predicate accessibleBy P1017 FINISHED
Object Beijing–Zhangjiakou intercity railway
The Beijing–Zhangjiakou intercity railway is a high-speed rail line in northern China that connects Beijing with the city of Zhangjiakou and serves as a key transport link for the Beijing 2022 Winter Olympics region.
E359244 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Beijing–Zhangjiakou intercity railway | Statement: [Badaling, accessibleBy, Beijing–Zhangjiakou intercity railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Beijing–Zhangjiakou intercity railway
Context triple: [Badaling, accessibleBy, Beijing–Zhangjiakou intercity railway]
  • A. Beijing–Xiong’an intercity railway
    The Beijing–Xiong’an intercity railway is a high-speed rail line in China that connects Beijing with the newly developed Xiong’an New Area, serving as a key transport link for the region’s integrated development.
  • B. Beijing–Tianjin Intercity Railway
    The Beijing–Tianjin Intercity Railway is a high-speed rail line in China that connects the cities of Beijing and Tianjin, significantly reducing travel time between the two major urban centers.
  • C. Beijing–Guangzhou High-Speed Railway
    The Beijing–Guangzhou High-Speed Railway is one of China’s longest and busiest high-speed rail corridors, linking the capital Beijing with the southern metropolis Guangzhou and serving major cities along the route.
  • D. Beijing–Shanghai High-Speed Railway
    The Beijing–Shanghai High-Speed Railway is a major high-speed rail corridor in China that connects the capital Beijing with the economic hub Shanghai, significantly reducing travel time between the two megacities.
  • E. Beijing–Hong Kong (Taipei) high-speed rail corridor
    The Beijing–Hong Kong (Taipei) high-speed rail corridor is a major north–south trunk line in China’s high-speed rail network, planned to link the capital Beijing with Hong Kong and onward toward Taipei as part of the national “eight vertical and eight horizontal” system.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Beijing–Zhangjiakou intercity railway
Triple: [Badaling, accessibleBy, Beijing–Zhangjiakou intercity railway]
Generated description
The Beijing–Zhangjiakou intercity railway is a high-speed rail line in northern China that connects Beijing with the city of Zhangjiakou and serves as a key transport link for the Beijing 2022 Winter Olympics region.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Beijing–Zhangjiakou intercity railway
Target entity description: The Beijing–Zhangjiakou intercity railway is a high-speed rail line in northern China that connects Beijing with the city of Zhangjiakou and serves as a key transport link for the Beijing 2022 Winter Olympics region.
  • A. Beijing–Xiong’an intercity railway
    The Beijing–Xiong’an intercity railway is a high-speed rail line in China that connects Beijing with the newly developed Xiong’an New Area, serving as a key transport link for the region’s integrated development.
  • B. Beijing–Tianjin Intercity Railway
    The Beijing–Tianjin Intercity Railway is a high-speed rail line in China that connects the cities of Beijing and Tianjin, significantly reducing travel time between the two major urban centers.
  • C. Beijing–Guangzhou High-Speed Railway
    The Beijing–Guangzhou High-Speed Railway is one of China’s longest and busiest high-speed rail corridors, linking the capital Beijing with the southern metropolis Guangzhou and serving major cities along the route.
  • D. Beijing–Shanghai High-Speed Railway
    The Beijing–Shanghai High-Speed Railway is a major high-speed rail corridor in China that connects the capital Beijing with the economic hub Shanghai, significantly reducing travel time between the two megacities.
  • E. Beijing–Hong Kong (Taipei) high-speed rail corridor
    The Beijing–Hong Kong (Taipei) high-speed rail corridor is a major north–south trunk line in China’s high-speed rail network, planned to link the capital Beijing with Hong Kong and onward toward Taipei as part of the national “eight vertical and eight horizontal” system.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85b224d481908ff8be51338d24ff completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adbae745e081909007cd3a664c57f3 completed March 8, 2026, 6:07 p.m.
NED1 Entity disambiguation (via context triple) batch_69b3611ff950819081b49f5c75aa6e4d completed March 13, 2026, 12:58 a.m.
NEDg Description generation batch_69b3629f2e54819091b38de147996782 completed March 13, 2026, 1:04 a.m.
NED2 Entity disambiguation (via description) batch_69b3630f5628819080ab239790cf4f4d completed March 13, 2026, 1:06 a.m.
Created at: March 8, 2026, 3:17 p.m.