Triple

T34594899
Position Surface form Disambiguated ID Type / Status
Subject CPython Git repository E888282 entity
Predicate instanceOf P0 FINISHED
Object official project repository C58781 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: official project repository
Context triple: [CPython Git repository, instanceOf, official project repository]
  • A. open-source project hosting website
    An open-source project hosting website is an online platform where developers can collaboratively store, manage, share, and track the development of publicly accessible software projects and their source code.
  • B. Git repository chosen
    A Git repository is a version-controlled data structure that stores a project's files, their complete revision history, and metadata, enabling tracking, collaboration, and management of changes over time.
  • C. R project hosting service
    A R project hosting service is an online platform that provides version control, collaboration tools, and infrastructure for developing, sharing, and maintaining R-based data analysis and software projects.
  • D. Git repository hosting service
    A Git repository hosting service is an online platform that stores, manages, and facilitates collaboration on Git-based source code repositories, providing features like version control, access control, issue tracking, and integration with development tools.
  • E. open-source organization
    An open-source organization is a collaborative entity that develops, maintains, and governs software or other projects whose source materials are publicly accessible, modifiable, and distributable under open licenses.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349d3bfcc81909874c99e646fb3ea completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:03 a.m.