Triple
T34594004
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Catoosa Springs |
E888260
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former health resort |
C12925
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former health resort Context triple: [Catoosa Springs, instanceOf, former health resort]
-
A.
former resort
chosen
A former resort is a once-operational vacation or leisure property that has ceased functioning in its original capacity, often repurposed, abandoned, or left in partial use.
-
B.
former seaside resort
A former seaside resort is a coastal town or area that once thrived as a holiday destination but has since declined in popularity, tourism, or infrastructure.
-
C.
historic resort
A historic resort is a long-established vacation property that combines preserved architectural or cultural heritage with modern hospitality amenities and leisure activities.
-
D.
former ski resort community
A former ski resort community is a residential or mixed-use area that developed around a once-operational ski resort, retaining its mountain-town character and infrastructure despite the cessation of ski operations.
-
E.
resort
A resort is a commercial establishment that provides lodging, dining, recreation, and leisure amenities in a single destination designed for relaxation and vacation experiences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349d3bfcc81909874c99e646fb3ea |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:03 a.m.