Triple

T34591178
Position Surface form Disambiguated ID Type / Status
Subject Sikorsky S-58 design E888185 entity
Predicate instanceOf P0 FINISHED
Object helicopter airframe design C51062 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: helicopter airframe design
Context triple: [Sikorsky S-58 design, instanceOf, helicopter airframe design]
  • A. helicopter tail rotor system
    A helicopter tail rotor system is a mechanical assembly that provides anti-torque and directional control by generating lateral thrust at the tail of the helicopter.
  • B. helicopter concept chosen
    A helicopter concept is an abstract representation of a rotary-wing aircraft’s essential characteristics, including its structure, propulsion, control systems, and operational capabilities, independent of any specific physical instance.
  • C. piston-powered helicopter
    A piston-powered helicopter is a rotary-wing aircraft whose main rotor is driven by one or more reciprocating (piston) engines, typically used for light-duty, training, or private operations due to their lower cost and complexity compared to turbine-powered helicopters.
  • D. tandem-rotor helicopter
    A tandem-rotor helicopter is a rotary-wing aircraft featuring two large horizontal rotors mounted one in front of the other, rotating in opposite directions to provide lift and directional control without the need for a tail rotor.
  • E. helicopter powerplant
    A helicopter powerplant is the integrated system of engines and associated components that generate and transmit power to drive the helicopter’s rotors and onboard systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349d3bfcc81909874c99e646fb3ea completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:03 a.m.