Triple

T34588261
Position Surface form Disambiguated ID Type / Status
Subject Fort Missoula E888105 entity
Predicate instanceOf P0 FINISHED
Object historic U.S. Army post C13905 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: historic U.S. Army post
Context triple: [Fort Missoula, instanceOf, historic U.S. Army post]
  • A. former military barracks
    A former military barracks is a decommissioned facility that once housed and supported soldiers, now often repurposed for civilian, cultural, or commercial uses.
  • B. former military training camp
    A former military training camp is a decommissioned facility once used to prepare armed forces personnel through drills, exercises, and instruction, now repurposed, abandoned, or preserved for historical or alternative uses.
  • C. historic military fort chosen
    A historic military fort is a fortified structure or complex built in the past for defense and military operations, often preserved today as a cultural and historical landmark.
  • D. former air force base
    A former air force base is a decommissioned military airfield and associated facilities that once supported air force operations but has since been closed, repurposed, or abandoned.
  • E. former military complex
    A former military complex is a decommissioned installation once used for defense or armed forces operations, now repurposed, abandoned, or awaiting redevelopment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349d25cbc8190869998de5915886b completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:03 a.m.