Triple
T34572434
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tosafot Yom Tov |
E887659
|
entity |
| Predicate | primaryWorkOn |
—
|
GENERATED |
| Object | Mishnah |
—
|
UNRECOGNIZED GENERATED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: primaryWorkOn Context triple: [Tosafot Yom Tov, primaryWorkOn, Mishnah]
-
A.
primaryWork
Indicates that one work is the main or most significant work associated with a given entity, as opposed to other secondary or related works.
-
B.
workOn
Indicates that an agent is actively engaged in performing tasks or making progress on a particular project, object, or assignment.
-
C.
primaryTask
Indicates that an entity has a main or most important task, role, or function it is responsible for above all others.
-
D.
workedPrimarilyOn
chosen
Indicates that an entity devoted the majority of its work, effort, or activity to a particular project, field, or subject.
-
E.
firstWork
Indicates that the related work is the earliest or initial work created, published, or produced by the entity in question.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349d1a5fc81908557a46875b2f157 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:03 a.m.