Triple
T34543974
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | OpenSeaMap |
E886873
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | OpenStreetMap-based project |
C13253
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: OpenStreetMap-based project Context triple: [OpenSeaMap, instanceOf, OpenStreetMap-based project]
-
A.
GPS-compatible cycling map
A GPS-compatible cycling map is a digital or printable map specifically designed for cyclists that integrates with GPS devices or apps to provide accurate, bike-friendly routes, navigation, and location tracking.
-
B.
OSM wiki page
An OSM wiki page is a collaboratively edited documentation page that describes OpenStreetMap concepts, tags, features, and community practices.
-
C.
overpass
An overpass is a bridge-like structure that allows one transportation route, such as a road or railway, to cross over another without intersecting at the same level.
-
D.
navigation improvement project
A navigation improvement project is an initiative focused on analyzing, redesigning, and optimizing wayfinding systems, routes, and interfaces to make it easier and more efficient for users to reach their desired destinations.
-
E.
web mapping API
chosen
A web mapping API is a set of programmable interfaces that allow developers to embed, customize, and interact with digital maps and geospatial data within web applications.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349ce5eb881909e431c670944aa68 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:02 a.m.