Triple

T34543974
Position Surface form Disambiguated ID Type / Status
Subject OpenSeaMap E886873 entity
Predicate instanceOf P0 FINISHED
Object OpenStreetMap-based project C13253 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: OpenStreetMap-based project
Context triple: [OpenSeaMap, instanceOf, OpenStreetMap-based project]
  • A. GPS-compatible cycling map
    A GPS-compatible cycling map is a digital or printable map specifically designed for cyclists that integrates with GPS devices or apps to provide accurate, bike-friendly routes, navigation, and location tracking.
  • B. OSM wiki page
    An OSM wiki page is a collaboratively edited documentation page that describes OpenStreetMap concepts, tags, features, and community practices.
  • C. overpass
    An overpass is a bridge-like structure that allows one transportation route, such as a road or railway, to cross over another without intersecting at the same level.
  • D. navigation improvement project
    A navigation improvement project is an initiative focused on analyzing, redesigning, and optimizing wayfinding systems, routes, and interfaces to make it easier and more efficient for users to reach their desired destinations.
  • E. web mapping API chosen
    A web mapping API is a set of programmable interfaces that allow developers to embed, customize, and interact with digital maps and geospatial data within web applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349ce5eb881909e431c670944aa68 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:02 a.m.