Triple
T34541751
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SIMtrace |
E886823
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Osmocom project |
C29206
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Osmocom project Context triple: [SIMtrace, instanceOf, Osmocom project]
-
A.
telecommunications software project
chosen
A telecommunications software project is an organized effort to design, develop, integrate, and deploy software systems that enable, manage, or optimize electronic communication over networks such as telephone, mobile, and internet infrastructures.
-
B.
Next Generation Node B
Next Generation Node B (gNB) is a 5G base station that provides radio access, control, and connectivity between user equipment and the 5G core network using New Radio (NR) technology.
-
C.
IMT-2000 radio interface
An IMT-2000 radio interface is a standardized third-generation (3G) mobile communication air interface specification that defines how user equipment and networks exchange radio signals to provide global, interoperable wireless voice and data services.
-
D.
3GPP network node
A 3GPP network node is a standardized functional entity within a 3GPP-defined mobile network (such as LTE or 5G) that performs specific control, user-plane, or management tasks to enable communication services.
-
E.
GPRS packet control unit implementation
A GPRS packet control unit implementation is the software and hardware logic that manages radio resource allocation, packet scheduling, and data flow control between mobile stations and the core network in a GPRS system.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349ce5eb881909e431c670944aa68 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:02 a.m.