Triple

T34541516
Position Surface form Disambiguated ID Type / Status
Subject OsmoHLR E886818 entity
Predicate instanceOf P0 FINISHED
Object telecommunications software C44391 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: telecommunications software
Context triple: [OsmoHLR, instanceOf, telecommunications software]
  • A. telecommunications software project
    A telecommunications software project is an organized effort to design, develop, integrate, and deploy software systems that enable, manage, or optimize electronic communication over networks such as telephone, mobile, and internet infrastructures.
  • B. telecommunications product
    A telecommunications product is a device, service, or software solution that enables the transmission, reception, or management of voice, data, or multimedia communications over distance.
  • C. telecommunications platform chosen
    A telecommunications platform is an integrated system that enables the transmission, management, and coordination of voice, data, and multimedia communications across diverse networks and devices.
  • D. telecommunications network
    A telecommunications network is a system of interconnected nodes, transmission media, and protocols that enables the exchange of voice, data, and multimedia information between users and devices over distance.
  • E. unified communications software
    Unified communications software is an integrated platform that combines voice, video, messaging, and collaboration tools into a single interface to streamline business communication and teamwork.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349ce5eb881909e431c670944aa68 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:02 a.m.