Triple

T34539174
Position Surface form Disambiguated ID Type / Status
Subject Wadi el-Hudi E886756 entity
Predicate instanceOf P0 FINISHED
Object amethyst quarry C43242 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: amethyst quarry
Context triple: [Wadi el-Hudi, instanceOf, amethyst quarry]
  • A. quarry chosen
    A quarry is an open-pit site where stone, rock, sand, gravel, or minerals are extracted from the earth for construction and industrial use.
  • B. opal mine
    An opal mine is a specialized mining site where opal-bearing rock or sediment is extracted, processed, and sorted to obtain gem-quality opals for commercial use.
  • C. granite quarry
    A granite quarry is an open-pit site where granite rock is extracted from the earth through drilling, cutting, and blasting for use in construction and architectural applications.
  • D. stone quarry
    A stone quarry is an open-pit site where rock, stone, and aggregate materials are extracted from the earth for construction and industrial use.
  • E. quartz arenite
    Quartz arenite is a sedimentary sandstone composed of more than 90% rounded to subrounded quartz grains, indicating extensive weathering, transport, and reworking.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349ce5eb881909e431c670944aa68 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:02 a.m.