Triple
T34538962
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | County Ditch 10 |
E886749
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | drainage ditch |
C6500
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: drainage ditch Context triple: [County Ditch 10, instanceOf, drainage ditch]
-
A.
drainage channel
chosen
A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
-
B.
drainage basin
A drainage basin is a land area where all precipitation collects and drains off into a common outlet, such as a river, lake, or ocean.
-
C.
drainage district
A drainage district is a special governmental or quasi-governmental entity created to manage, finance, and maintain systems that remove excess water from land to prevent flooding and improve land usability.
-
D.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
E.
diversion dam
A diversion dam is a low barrier built across a river or stream to redirect water into canals, pipelines, or other conveyance systems for irrigation, municipal use, or hydropower, rather than for large-scale storage.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349ce5eb881909e431c670944aa68 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:02 a.m.