Triple

T34536363
Position Surface form Disambiguated ID Type / Status
Subject Casa Fuster (initial project, later modified) E886679 entity
Predicate instanceOf P0 FINISHED
Object early design C13087 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: early design
Context triple: [Casa Fuster (initial project, later modified), instanceOf, early design]
  • A. early work chosen
    Early work refers to the initial phase of a project or creative endeavor, characterized by foundational efforts, experimentation, and the establishment of core ideas or structures.
  • B. early concept name
    A preliminary, often tentative label assigned to a new idea or project that captures its core intent before a final, refined name is chosen.
  • C. preliminary design program
    A preliminary design program is a software tool that supports early-stage conceptualization, analysis, and evaluation of design alternatives before detailed development begins.
  • D. early bird
    An early bird is a person who habitually wakes up and becomes active early in the morning, often gaining a perceived advantage from their head start on the day.
  • E. early railway
    An early railway is a pioneering rail transport system, typically from the late 18th to mid-19th century, characterized by primitive track technology, steam-powered locomotives, and foundational infrastructure that enabled the first large-scale movement of people and goods by rail.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349ce5eb881909e431c670944aa68 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:02 a.m.