Triple
T34536363
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Casa Fuster (initial project, later modified) |
E886679
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | early design |
C13087
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: early design Context triple: [Casa Fuster (initial project, later modified), instanceOf, early design]
-
A.
early work
chosen
Early work refers to the initial phase of a project or creative endeavor, characterized by foundational efforts, experimentation, and the establishment of core ideas or structures.
-
B.
early concept name
A preliminary, often tentative label assigned to a new idea or project that captures its core intent before a final, refined name is chosen.
-
C.
preliminary design program
A preliminary design program is a software tool that supports early-stage conceptualization, analysis, and evaluation of design alternatives before detailed development begins.
-
D.
early bird
An early bird is a person who habitually wakes up and becomes active early in the morning, often gaining a perceived advantage from their head start on the day.
-
E.
early railway
An early railway is a pioneering rail transport system, typically from the late 18th to mid-19th century, characterized by primitive track technology, steam-powered locomotives, and foundational infrastructure that enabled the first large-scale movement of people and goods by rail.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349ce5eb881909e431c670944aa68 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:02 a.m.