Triple

T34528241
Position Surface form Disambiguated ID Type / Status
Subject Manjira Water Supply Scheme E886463 entity
Predicate instanceOf P0 FINISHED
Object drinking water supply scheme C3665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: drinking water supply scheme
Context triple: [Manjira Water Supply Scheme, instanceOf, drinking water supply scheme]
  • A. drinking water infrastructure
    Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
  • B. water supply system chosen
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • C. drinking water infrastructure financing program
    A drinking water infrastructure financing program is a structured funding mechanism that provides loans, grants, or other financial assistance to plan, build, upgrade, and maintain public drinking water systems to ensure safe, reliable, and compliant water service.
  • D. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • E. public water access system
    A public water access system is an infrastructure and management framework that provides communities with safe, reliable, and equitable access to potable water through shared sources such as taps, fountains, and distribution points.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349cd7c148190aa99192b126d1527 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2:02 a.m.