Triple

T34524722
Position Surface form Disambiguated ID Type / Status
Subject Indian Navy aircraft carriers E886368 entity
Predicate plannedCarrier P146705 FINISHED
Object INS Vishal (IAC-2) NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: INS Vishal (IAC-2) | Statement: [Indian Navy aircraft carriers, plannedCarrier, INS Vishal (IAC-2)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedCarrier
Context triple: [Indian Navy aircraft carriers, plannedCarrier, INS Vishal (IAC-2)]
  • A. shipPlanned
    Indicates that an item or order is scheduled and intended to be shipped at a planned future time.
  • B. plannedVia
    Indicates that something is arranged, organized, or scheduled by means of a particular method, process, or intermediary.
  • C. intendedCarrier chosen
    Indicates that one entity is designated or planned to serve as the carrier or transporter of another entity.
  • D. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • E. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349cd7c148190aa99192b126d1527 completed April 30, 2026, 12:23 p.m.
NER Named-entity recognition batch_69fcc7338120819081cb46547d60f2cb completed May 7, 2026, 5:09 p.m.
PD Predicate disambiguation batch_69fcc58566a0819082d5ea36e03bf0c6 completed May 7, 2026, 5:01 p.m.
Created at: May 1, 2026, 2:02 a.m.