Triple
T34509491
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nerobergbahn |
E885981
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water-powered funicular |
C39891
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water-powered funicular Context triple: [Nerobergbahn, instanceOf, water-powered funicular]
-
A.
water-powered cliff railway
chosen
A water-powered cliff railway is a funicular transport system on a steep incline where two counterbalanced cars move up and down using water-filled tanks and gravity instead of engines.
-
B.
water-powered mill
A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
-
C.
rotating gondola lift
A rotating gondola lift is an aerial cable transport system in which enclosed cabins continuously circulate along a looped cable, allowing passengers to board and disembark while the cabins move slowly through stations.
-
D.
flight of canal locks
A flight of canal locks is a series of lock chambers arranged consecutively on a canal to raise or lower boats over a significant change in water level.
-
E.
mountain tramway
A mountain tramway is an aerial or cable-driven transportation system that carries passengers or goods up and down steep mountainous terrain using suspended or rail-guided cars.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349cc0220819081f154c6964f4dc2 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:01 a.m.