Triple
T34505932
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cerro Santa Ana stairway route |
E885884
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban walking route |
C2290
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban walking route Context triple: [Cerro Santa Ana stairway route, instanceOf, urban walking route]
-
A.
urban promenade
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
-
B.
walking guide
A walking guide is a person or resource that leads and informs individuals or groups on foot-based tours, providing directions, context, and insights about the surroundings.
-
C.
walking destination
A walking destination is a place or endpoint that people intentionally travel to on foot, often chosen for its accessibility, interest, or suitability for walking.
-
D.
walking path
chosen
A walking path is a designated route or track intended for pedestrian use, providing a safe and accessible way for people to walk, exercise, or enjoy their surroundings.
-
E.
self-guided tour route
A self-guided tour route is a predefined path or itinerary that visitors follow independently, using provided materials or digital tools for information and navigation without a live guide.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349cc0220819081f154c6964f4dc2 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:01 a.m.