Triple
T34503825
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Vivaha Mandap |
E885828
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ceremonial pavilion |
C60226
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ceremonial pavilion Context triple: [Vivaha Mandap, instanceOf, ceremonial pavilion]
-
A.
ornamental pavilion
An ornamental pavilion is a small, decorative, often open-sided structure placed in gardens or public spaces to provide shelter, focal interest, and aesthetic enhancement.
-
B.
ceremonial palace
A ceremonial palace is a grand, often architecturally elaborate residence or complex designed primarily for hosting formal state rituals, official receptions, and symbolic public events.
-
C.
ceremonial house
A ceremonial house is a specially designated structure used by a community for rituals, gatherings, and culturally significant events.
-
D.
ceremonial hall
A ceremonial hall is a large, formal space designed to host significant events, rituals, and gatherings such as weddings, graduations, and official ceremonies.
-
E.
ancient Chinese pavilion
An ancient Chinese pavilion is an open, often elevated architectural structure featuring ornate roofs and columns, traditionally used as a place for rest, contemplation, and scenic viewing in classical Chinese gardens and landscapes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349cc0220819081f154c6964f4dc2 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2:01 a.m.