Triple
T34460666
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | General Manager, East Central Railway |
E884629
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway administrative position |
C7910
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway administrative position Context triple: [General Manager, East Central Railway, instanceOf, railway administrative position]
-
A.
railway infrastructure manager
A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
-
B.
public administration position
chosen
A public administration position is a role within government or public sector organizations responsible for planning, implementing, and managing policies and services that serve the public interest.
-
C.
railway worker
A railway worker is an individual responsible for the operation, maintenance, safety, and support services of trains and railway infrastructure.
-
D.
railway controller
A railway controller is a system or role responsible for monitoring, coordinating, and directing train movements to ensure safe, efficient, and timely railway operations.
-
E.
railway office building
A railway office building is a facility that houses the administrative, operational, and support functions necessary for managing railway services, infrastructure, and personnel.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349c73a94819094dfcf50d00620b8 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 2 a.m.