Triple
T34447373
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | "Things fall apart; the centre cannot hold" |
E884265
|
entity |
| Predicate | lineNumberInPoem |
P71344
|
FINISHED |
| Object | opening of the third line of "The Second Coming" |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: opening of the third line of "The Second Coming" | Statement: ["Things fall apart; the centre cannot hold", lineNumberInPoem, opening of the third line of "The Second Coming"]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: lineNumberInPoem Context triple: ["Things fall apart; the centre cannot hold", lineNumberInPoem, opening of the third line of "The Second Coming"]
-
A.
precedesLineInPoem
Indicates that one line in a poem comes directly before another line in the poem in the poem’s sequence.
-
B.
positionInVerse
chosen
Indicates the specific ordinal location that something occupies within a verse.
-
C.
numberOfStanzasInOriginalPoem
Indicates the total count of stanzas contained in the poem’s original version.
-
D.
poemLength
Indicates the length or extent of a poem, typically measured in units such as lines, verses, or words.
-
E.
positionOnLine
Indicates that one entity occupies a specific location along a defined line or linear path in relation to another.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349c607688190b553539d14901a35 |
completed | April 30, 2026, 12:23 p.m. |
| NER | Named-entity recognition | batch_69f7194ea5508190873287896ca6967e |
completed | May 3, 2026, 9:45 a.m. |
| PD | Predicate disambiguation | batch_69f71824431081908d9685d2462ea242 |
completed | May 3, 2026, 9:40 a.m. |
Created at: May 1, 2026, 2 a.m.