Triple

T34437426
Position Surface form Disambiguated ID Type / Status
Subject Central Electricity Authority of India E884000 entity
Predicate instanceOf P0 FINISHED
Object electricity regulatory organization C51907 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electricity regulatory organization
Context triple: [Central Electricity Authority of India, instanceOf, electricity regulatory organization]
  • A. Electricity regulatory commission chosen
    An electricity regulatory commission is a governing body that oversees, regulates, and enforces policies for the generation, transmission, distribution, and pricing of electrical power to ensure reliability, fairness, and consumer protection.
  • B. electricity reliability regulator
    An electricity reliability regulator is an authority responsible for setting, monitoring, and enforcing standards to ensure the continuous, safe, and dependable operation of the electric power system.
  • C. electricity industry association
    An electricity industry association is an organized group that represents and advocates for the collective interests of companies and stakeholders involved in the generation, transmission, distribution, and sale of electric power.
  • D. regional transmission organization
    A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
  • E. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349c548d88190978e2a82502c03d0 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 2 a.m.