Triple

T34415947
Position Surface form Disambiguated ID Type / Status
Subject Negation E883403 entity
Predicate instanceOf P0 FINISHED
Object truth‑functional connective C45320 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: truth‑functional connective
Context triple: [Negation, instanceOf, truth‑functional connective]
  • A. Logical construct chosen
    A logical construct is an abstract entity or framework composed of propositions, operators, and rules used to represent, analyze, or derive logical relationships and conclusions.
  • B. doctrine of conditional predication
    The doctrine of conditional predication is a logical and philosophical principle stating that a subject can be truly predicated of a property or attribute only under certain specified conditions or circumstances.
  • C. formal logic
    Formal logic is the systematic study of valid reasoning and inference using precisely defined symbols, rules, and structures independent of specific content.
  • D. possible‑worlds semantics
    Possible-worlds semantics is a formal framework in logic and linguistics that interprets the meaning of sentences by evaluating their truth across a range of alternative, systematically structured possible worlds.
  • E. relation
    A relation is an abstract association that connects two or more entities based on a defined rule, property, or interaction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349c2e3b88190a67834eb5bcffeaf completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 1:59 a.m.