Triple
T3441497
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Faroese Language Council |
E72574
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | standardization authority |
C3871
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: standardization authority Context triple: [Faroese Language Council, instanceOf, standardization authority]
-
A.
standards-setting organization
chosen
A standards-setting organization is an entity that develops, maintains, and promotes agreed-upon technical, professional, or procedural norms to ensure compatibility, quality, and interoperability across industries or sectors.
-
B.
technical standards body
A technical standards body is an organization that develops, maintains, and promotes agreed-upon technical specifications and protocols to ensure interoperability, safety, and consistency across industries and technologies.
-
C.
organ of the International Organization for Standardization
An organ of the International Organization for Standardization is a formal structural body within ISO, such as a council, committee, or technical group, that is responsible for specific governance, coordination, or standardization functions.
-
D.
official standard
An official standard is an authoritative, formally approved specification or guideline established by a recognized body to ensure consistency, compatibility, and quality across products, services, or processes.
-
E.
regulatory authority
A regulatory authority is an official body empowered by law to create, implement, and enforce rules and standards within a specific domain to protect public interests and ensure compliance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85af50288190a854b76653deee6f |
completed | March 8, 2026, 2:20 p.m. |
Created at: March 8, 2026, 3:16 p.m.