Triple

T3441343
Position Surface form Disambiguated ID Type / Status
Subject Scottish Qualifications Authority Gaelic materials E72571 entity
Predicate instanceOf P0 FINISHED
Object assessment material C663 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: assessment material
Context triple: [Scottish Qualifications Authority Gaelic materials, instanceOf, assessment material]
  • A. construction material
    A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
  • B. textbook
    A textbook is a structured, authoritative book designed to systematically present and explain the core knowledge and skills of a specific subject, typically for educational use in courses or self-study.
  • C. educational resource chosen
    An educational resource is any material, tool, or medium designed to support and enhance learning, teaching, or the acquisition of knowledge and skills.
  • D. materials specification
    A materials specification defines the required types, properties, standards, and quality criteria for materials to be used in a product, component, or construction.
  • E. building material
    A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85af50288190a854b76653deee6f completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:16 p.m.