Triple
T34393360
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Changi, Singapore |
E882766
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Planning area |
C47789
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Planning area Context triple: [Changi, Singapore, instanceOf, Planning area]
-
A.
land use planning area
A land use planning area is a defined geographic region designated for coordinated management and regulation of land uses to achieve specific environmental, social, and economic development objectives.
-
B.
planning district
A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
-
C.
community plan area
A community plan area is a geographically defined section of a jurisdiction for which detailed land use, development, and infrastructure policies are established to guide local growth and community character.
-
D.
Planning area of Singapore
chosen
A planning area of Singapore is an officially designated geographic subdivision used for urban planning, administration, and statistical purposes within the country.
-
E.
land use plan
A land use plan is a strategic document that guides the allocation, development, and conservation of land within a defined area to balance environmental, social, and economic objectives.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349c1304081909331872829e38106 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:59 a.m.