Triple
T34347061
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nimrod AEW3 |
E881463
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | military aircraft project |
C61730
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: military aircraft project Context triple: [Nimrod AEW3, instanceOf, military aircraft project]
-
A.
military project
A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
-
B.
military aircraft engine development program
A military aircraft engine development program is an organized, multi-phase effort to research, design, test, and field advanced propulsion systems that meet specific performance, reliability, cost, and strategic requirements for military aircraft.
-
C.
bomber aircraft project
A bomber aircraft project is a coordinated effort to design, develop, test, and produce an aircraft optimized for delivering explosive ordnance to ground or sea targets under specified operational requirements.
-
D.
military aircraft
A military aircraft is a powered flying vehicle specifically designed, equipped, and operated by armed forces to conduct combat, support, reconnaissance, or training missions in defense and warfare operations.
-
E.
unbuilt aircraft project
An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349bc55e881908c8e338ef76b0043 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:58 a.m.