Triple

T34347060
Position Surface form Disambiguated ID Type / Status
Subject Nimrod AEW3 E881463 entity
Predicate instanceOf P0 FINISHED
Object airborne early warning and control aircraft project C61280 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: airborne early warning and control aircraft project
Context triple: [Nimrod AEW3, instanceOf, airborne early warning and control aircraft project]
  • A. anti-submarine warfare aircraft program
    A coordinated initiative to design, develop, acquire, and sustain specialized aircraft, systems, and capabilities dedicated to detecting, tracking, and neutralizing submarine threats.
  • B. maritime patrol aircraft program
    A maritime patrol aircraft program is an organized effort to design, acquire, operate, and sustain aircraft and supporting systems dedicated to long-range surveillance, anti-submarine warfare, and protection of maritime domains.
  • C. bomber aircraft project
    A bomber aircraft project is a coordinated effort to design, develop, test, and produce an aircraft optimized for delivering explosive ordnance to ground or sea targets under specified operational requirements.
  • D. airborne early warning squadron
    An airborne early warning squadron is a military aviation unit equipped with specialized radar aircraft to detect, track, and relay information on aerial and surface threats, providing command and control support to friendly forces.
  • E. X-plane
    An X-plane is an experimental aircraft designed to test and demonstrate new aviation technologies, configurations, or performance capabilities beyond those of conventional aircraft.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349bc55e881908c8e338ef76b0043 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 1:58 a.m.