Triple

T34302749
Position Surface form Disambiguated ID Type / Status
Subject Spider E880222 entity
Predicate partOfMissionPhase P52571 FINISHED
Object Apollo 9 Earth-orbital test phase LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Apollo 9 Earth-orbital test phase | Statement: [Spider, partOfMissionPhase, Apollo 9 Earth-orbital test phase]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfMissionPhase
Context triple: [Spider, partOfMissionPhase, Apollo 9 Earth-orbital test phase]
  • A. partOfMission chosen
    Indicates that one entity is a component, phase, or element belonging to or included within a larger mission.
  • B. correctedDuringMission
    Indicates that an issue, error, or deviation was identified and successfully corrected while the mission was still in progress.
  • C. partOfMissionType
    Indicates that one entity represents a specific mission type of which the other entity is a constituent or component part.
  • D. missionProfilePhase
    Indicates the specific phase or stage within a mission profile during which an action, condition, or relationship is applicable.
  • E. supportsMissionPhase
    Indicates that one entity provides the necessary capabilities, resources, or conditions for another entity to function or be valid during a specific mission phase.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349b79f6c81909cb468c92c39c74d completed April 30, 2026, 12:23 p.m.
NER Named-entity recognition batch_6a0045a7b4c081908e4dedabda7cf790 completed May 10, 2026, 8:45 a.m.
PD Predicate disambiguation batch_6a0042b148a48190974b173f352e4b7f completed May 10, 2026, 8:32 a.m.
Created at: May 1, 2026, 1:57 a.m.