Triple
T34281797
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Interstate 794 |
E879609
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Interstate Highway in Wisconsin |
C527
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Interstate Highway in Wisconsin Context triple: [Interstate 794, instanceOf, Interstate Highway in Wisconsin]
-
A.
numbered highway in Wisconsin
A numbered highway in Wisconsin is a designated state, U.S., or Interstate route within Wisconsin’s borders that provides organized, signed corridors for vehicular travel and connectivity between cities, towns, and regions.
-
B.
Interstate Highway
chosen
An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
-
C.
United States federal road
A United States federal road is a roadway that is part of the national highway system and is funded, regulated, or maintained in whole or in part by the federal government to support interstate travel, commerce, and defense.
-
D.
state highway
A state highway is a public road maintained and administered by a state government, forming part of a regional or statewide transportation network that connects cities, towns, and other major routes.
-
E.
interstate highway system component
An interstate highway system component is any physical or functional element—such as roadways, interchanges, signage, or support infrastructure—that collectively enables the operation, connectivity, and safety of the national interstate highway network.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349b5f6648190b9420d94a4cd16e0 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:57 a.m.