Triple
T34261291
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Central Basin Platform |
E879038
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | structural uplift |
C41490
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: structural uplift Context triple: [Central Basin Platform, instanceOf, structural uplift]
-
A.
structural high
chosen
A structural high is a geologic feature where rock layers or strata are arched or uplifted relative to surrounding areas, often forming potential traps for hydrocarbons.
-
B.
tectonic structure
A tectonic structure is a large-scale feature of the Earth's crust, such as faults, folds, or plate boundaries, formed and shaped by the movement and interaction of tectonic plates.
-
C.
mountain-building event
A mountain-building event is a geological process, typically driven by plate tectonics, in which the Earth's crust is deformed, uplifted, and thickened to form mountain ranges over millions of years.
-
D.
impact structure
An impact structure is a geological formation created by the collision of a meteoroid, asteroid, or comet with a planetary surface, typically characterized by a crater and associated deformation features.
-
E.
mass movement
Mass movement is the downslope transport of soil, rock, and debris under the direct influence of gravity, often occurring rapidly and sometimes catastrophically.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349b421cc8190b4b4655e1d612548 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:56 a.m.