Triple
T34223195
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Monuments Acts |
E877979
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Irish legislation |
C14589
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Irish legislation Context triple: [National Monuments Acts, instanceOf, Irish legislation]
-
A.
Act of the Oireachtas
chosen
An Act of the Oireachtas is a formal law enacted by Ireland’s national legislature, comprising the Dáil and Seanad, and signed by the President.
-
B.
Irish state report
An Irish state report is an official document produced by the Government of Ireland that presents information, analysis, and updates on specific policy areas, compliance obligations, or national conditions to domestic or international stakeholders.
-
C.
Government of Ireland Bill 1893
The Government of Ireland Bill 1893 was a proposed act of the British Parliament, introduced by Prime Minister William Ewart Gladstone, to establish a devolved Irish legislature and grant Home Rule to Ireland, which ultimately failed to become law after being rejected by the House of Lords.
-
D.
Irish state redress scheme
An Irish state redress scheme is a government-established compensation and support program designed to acknowledge, address, and remedy harm suffered by individuals due to past institutional or state-related wrongdoing in Ireland.
-
E.
Irish government
The Irish government is the system of political institutions and public administration that exercises executive authority, implements laws, and manages the affairs of the state in the Republic of Ireland.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349b16d0481908754e3069f05e0c1 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:55 a.m.