Triple

T34222716
Position Surface form Disambiguated ID Type / Status
Subject Liffey hydroelectric scheme E877966 entity
Predicate instanceOf P0 FINISHED
Object water-management project C1458 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water-management project
Context triple: [Liffey hydroelectric scheme, instanceOf, water-management project]
  • A. water management project chosen
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • B. water resources programme
    A water resources programme is an organized set of policies, projects, and management activities aimed at sustainably developing, allocating, protecting, and monitoring water resources to meet environmental, social, and economic needs.
  • C. water transfer project
    A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
  • D. water management structure
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • E. water level management practice
    A water level management practice is a coordinated set of methods and operations used to monitor, control, and adjust water levels in natural or engineered systems to meet ecological, safety, and resource-use objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349b16d0481908754e3069f05e0c1 completed April 30, 2026, 12:23 p.m.
Created at: May 1, 2026, 1:55 a.m.