Triple
T34222716
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Liffey hydroelectric scheme |
E877966
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water-management project |
C1458
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water-management project Context triple: [Liffey hydroelectric scheme, instanceOf, water-management project]
-
A.
water management project
chosen
A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
-
B.
water resources programme
A water resources programme is an organized set of policies, projects, and management activities aimed at sustainably developing, allocating, protecting, and monitoring water resources to meet environmental, social, and economic needs.
-
C.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
-
D.
water management structure
A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
-
E.
water level management practice
A water level management practice is a coordinated set of methods and operations used to monitor, control, and adjust water levels in natural or engineered systems to meet ecological, safety, and resource-use objectives.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349b16d0481908754e3069f05e0c1 |
completed | April 30, 2026, 12:23 p.m. |
Created at: May 1, 2026, 1:55 a.m.