Triple

T3421569
Position Surface form Disambiguated ID Type / Status
Subject VFP floating-point extension E72125 entity
Predicate instanceOf P0 FINISHED
Object coprocessor feature C13232 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coprocessor feature
Context triple: [VFP floating-point extension, instanceOf, coprocessor feature]
  • A. workload management feature
    A workload management feature is a system capability that helps plan, distribute, and monitor tasks and resources to balance capacity, avoid bottlenecks, and ensure timely completion of work.
  • B. continuity feature
    A continuity feature is a design element or mechanism that ensures a seamless, consistent experience or behavior across different states, times, or contexts within a system.
  • C. copy-on-write file system
    A copy-on-write file system is a storage system that defers data copying until modification, allowing snapshots and efficient versioning by sharing unchanged data blocks between files or system states.
  • D. mobile application feature
    A mobile application feature is a distinct, user-facing capability or function within a mobile app that enables users to perform specific tasks or achieve particular goals.
  • E. OSS branch
    An OSS branch is a parallel line of development in an open-source software repository where changes can be made, tested, and reviewed independently before being merged into the main codebase.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85ad38e48190b7660c5118a35289 completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:15 p.m.