Triple
T34206325
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Snoqualmie Falls |
E877519
|
entity |
| Predicate | hydroelectricPlantName |
P46937
|
FINISHED |
| Object | Snoqualmie Falls Hydroelectric Plant |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Snoqualmie Falls Hydroelectric Plant | Statement: [Snoqualmie Falls, hydroelectricPlantName, Snoqualmie Falls Hydroelectric Plant]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hydroelectricPlantName Context triple: [Snoqualmie Falls, hydroelectricPlantName, Snoqualmie Falls Hydroelectric Plant]
-
A.
powerPlantName
chosen
Indicates the specific name assigned to a power plant.
-
B.
hasHydropowerRoleIn
Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
-
C.
rankAmongWorldHydroelectricPlantsByCapacity
Indicates the position of a hydroelectric plant in a global ranking ordered by its electricity generation capacity.
-
D.
hydroelectricStationCommissioned
Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
-
E.
hydroelectricStationCapacity
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349aff5f0819096275315abea5344 |
completed | April 30, 2026, 12:23 p.m. |
| NER | Named-entity recognition | batch_69f71362f1448190985a80ce7af475cb |
completed | May 3, 2026, 9:20 a.m. |
| PD | Predicate disambiguation | batch_69f7127884388190884f23d181a65d19 |
completed | May 3, 2026, 9:16 a.m. |
Created at: May 1, 2026, 1:55 a.m.