Triple

T3420611
Position Surface form Disambiguated ID Type / Status
Subject Dev channel E72106 entity
Predicate instanceOf P0 FINISHED
Object pre-release software version C9711 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pre-release software version
Context triple: [Dev channel, instanceOf, pre-release software version]
  • A. beta testing program
    A beta testing program is a structured initiative where a pre-release version of a product is distributed to a limited group of external users to identify bugs, gather feedback, and validate performance before full public launch.
  • B. software release model chosen
    A software release model is a conceptual framework that defines how, when, and in what form software versions are planned, built, tested, and delivered to users over time.
  • C. research prototype
    A research prototype is an early, often experimental implementation of a concept or system created to explore feasibility, validate ideas, and gather feedback before full-scale development.
  • D. software
    Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
  • E. software product edition
    A software product edition is a specific version or configuration of a software product that bundles particular features, capabilities, and licensing terms targeted at a defined user segment or use case.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85ad38e48190b7660c5118a35289 completed March 8, 2026, 2:20 p.m.
Created at: March 8, 2026, 3:15 p.m.